Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 2:02am On Aug 01, 2018 |
We were able to do this today 31st July 2018. We resumed the upper floor just two days after casting. That might surprise you. However we are applying safety propping in place and reducing weight on the building in the best way possible. After which the building would be left without touch for a month before plastering can commence...
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 2:08am On Aug 01, 2018 |
More pictures from July 31st Work. Upper Floor was adjusted to be two unit of one bedroom Flat now.
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 10:37pm On Aug 01, 2018 |
Hello guys. Today 1st August Birth to this... We are already at the upper floor lintel level... Pillars in place, lintel to continue tomorrow while the Carpenter starts upper floor chain round again...
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by ogaibe1(m): 10:46pm On Aug 01, 2018 |
Mr Dennis, I see your doing your thing already, I like the bold steps you have taken to feature your work here, there are a lot of professionals just like you and be ready to answer questions so that the trust and confidence in your work can stand out. I like what am seeing already and am confident that you have more project including mine loading. 1 Like 1 Share |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 11:24pm On Aug 01, 2018 |
ogaibe1: Thank you sir. Pls feel free to ask your questions anytime for anything about construction. I am very deep into building design and construction and am willing to help. As we speak. Am currently doing some projects for two Nairaland clients. Big projects... And I can share the pictures here |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 11:27pm On Aug 01, 2018 |
An ongoing project I designed for a Nairaland client and am currently building it too in Ajah. Started it February this year. Here is the 3D and the real life construction images.
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 11:33pm On Aug 01, 2018 |
This year alone I have been opportune to do 4 projects currently ongoing. I designed all and am doing the construction. I have an in depth knowledge of these foundation types. - Strip - Strip and Pad. - Isolated Pad - Raft - A combination of either of two or more foundation types. The locations I have projects ongoing are - Lakowe Ajah Lagos - Oke Aro Ogun State - Gbagada Lagos State - Uratta North Imo State - PHC River State of which this thread is capturing it. Other projects listed here have their own thread and posts here in my profile. You might want to take your time to check it out... We design and build homes not houses... |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 11:35pm On Aug 01, 2018 |
Client: Nairaland Project Location: Gbagada Project Lagos State Architect: Dennis3D Contractors: Dennis3D
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by InvertedHammer: 2:47am On Aug 02, 2018 |
Dennis3D: / Ever considered concrete and materials lift. It pays for itself overtime. I try to bypass waste. You are trying o! Rain in PH is on another level. I had to abandon ship in June after rain no gree make we progress. No rain on Fridays because of Ikwerre burials ( ) that's what I heard and it seemed to work. Well...Kudos! / 2 Likes |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dominionng(m): 3:20am On Aug 02, 2018 |
Dennis3D: It is called Cement Board sir. Kalsi is a brand. Beautiful thread by the way. 2 Likes |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 8:47am On Aug 02, 2018 |
Dominionng: Thanks for that info. Very important |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 8:51am On Aug 02, 2018 |
InvertedHammer: Hmmm rain in PHC is something else especially at this time of the year. It's been raining everyday here but thank God that the times I don't need the rain to fall it wouldn't. Thank God for that. Not my power. Example. The day we cast decking. It rain heavily on the Sunday morning 30th July in PHC. In fact I almost gave up on the rain. By 8am it stopped and was drizzling. By 10am sun ☀ came out and was really shining very well. Till evening. The next day was sun too for two days. It's been nice and challenging at the same time. |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Nobody: 10:01am On Aug 02, 2018 |
Dominionng: Thanks for the information. Do you have any idea of the size and cost of the board? |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 11:38am On Aug 02, 2018 |
gordonbarrett: I have a contact for the board dealer in Lagos but not here in ph. In fact I went out this morning to look for the board at mile 3 in PHC here. I didn't find it. So am going to change the roof facial now to concrete facial with its own design. Am currently designing it on my system now. I have communicated with the client about it though so we have other options... |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dominionng(m): 4:41pm On Aug 02, 2018 |
gordonbarrett: Cost depends on size and thickness. Ranges from 10k - 35k a piece Sizes: 1.2m x 2.4m, 1.2m x 3m Thickness: 6mm, 8mm, 10mm 12mm, 20mm 2 Likes |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 4:44pm On Aug 02, 2018 |
Dominionng: You are 100% correct with this info. I confirmed from the dealers in Lagos this exact information you wrote here. |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 5:55am On Aug 03, 2018 |
August 2nd 2018 We are at Lintel already. That's day 17 of our work .. More pictures to follow as we cast today August 3rd.
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 6:02am On Aug 03, 2018 |
After going to check for the design roofing facial we initially designed and couldn't get it in the market here in pH. We therefore resort to casting parapet now. But first I have redesigned the roof pattern just yesterday. Reviewed with client and its accepted. Here is the new approach now. Now that's why we are extremely competent and fast because from design to construction. We are always on ground providing additional support to our client. Note: this parapet design is more cost effective than the curved shaped one. Which we did the design too and presented the 3 different roofing designing to the client to pick from. 1 Like 1 Share
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 8:44pm On Aug 03, 2018 |
Today 3rd August - This is how far we went. Casting of the upper floor Lintel and Columns just after two days block work.
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 9:07pm On Aug 03, 2018 |
DAY 18 of the Project. More photos from today August 3rd... Seeing is believing...
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by mufutau55(m): 3:04am On Aug 04, 2018 |
You don try well, well o. Keep it up Sir. Hajji M. 1 Like |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 5:12am On Aug 04, 2018 |
mufutau55: Thanks Hajji. Your guy is loyal. Doing stuff gradually |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 7:50am On Aug 05, 2018 |
Today been day 20 of this construction. Watch out as we start the parapet carpentry works today. Leveling was completed yesterday 4th August making it Day 19. We are still moving on and on... See photos of yesterday works before leveling commenced...
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Nobody: 1:24pm On Aug 05, 2018 |
Dominionng: Thanks. Very valuable info. 1 Like |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 12:12am On Aug 06, 2018 |
mufutau55: Pls how do I advertise - boost my posts here. Pay and boost on property section. I need more details on how to go about this... |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 12:21am On Aug 06, 2018 |
Photo update from today Day 20 — August 5th Dennis3D is working 07038166370, 08081465833 Dennis3ddesigns@gmail.com We don't stop at anything... We are almost there. Started the parapet carpentry works today... Welder to commence tomorrow Day 22 - August 6th. First see photos
|
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 12:27am On Aug 06, 2018 |
.... |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by mufutau55(m): 12:12pm On Aug 06, 2018 |
Dennis3D: There are little buttons on the main page that tells you how to do this. I will look for it and copy you the link. You are doing a good job and keep doing it Sir. Hajji M. 2 Likes |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by mufutau55(m): 12:14pm On Aug 06, 2018 |
1 Like |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by mexxy1(m): 1:02pm On Aug 06, 2018 |
Dennis3D: I have been following you and your jobs and, you're doing well but, I have to point out to you that you're very unprofessional in your approach to showcasing your jobs. Take note of the following; 1. Try as much as possible to post pictures of your jobs and not of you. 2. It is very unprofessional to post the interior of a client's living room no matter what statement you're trying to make. 3. Another unprofessional attribute you have is posting actual names of clients. I would rather you post the clients moniker (for those on nairaland) or blur the names (for those on or not on nairaland). That being said, I wish you well in your jobs. Thank you. 4 Likes |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 3:29pm On Aug 06, 2018 |
mexxy1: Thank you for your observations |
Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(m): 4:23am On Aug 11, 2018 |
Hello guys, Sorry the updates haven't come recently. Have really been busy on site. We can gladly tell you now that we are at the parapet as at August 9th. Every concrete work is done. It's been a collective efforts of all... Now it's time for the building to set well more. No roofing for now till some weeks later.
|
(1) (2) (3) (4) (5) (6) (7) (8) (Reply)
Lagos State Housing Mortgage Scheme Application / Will You Buy A House With A Maid's Room? / Illegal Structures At Oke Afa Demolished By Lagos State Government (Pics)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 41 |