Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,158,709 members, 7,837,604 topics. Date: Thursday, 23 May 2024 at 08:05 AM

Built In 1980, Capacity Doubled In 2012; Private Hall Extension - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Built In 1980, Capacity Doubled In 2012; Private Hall Extension (2228 Views)

FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS / Newly Built 3bedroom Terrace House At Lekki Phase II Gardens @21.5m / Lagos State Signs Smart City Deal With Dubai To Be Built In Ibeju Lekki (2) (3) (4)

(1) (2) (Reply) (Go Down)

Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 9:20pm On Jun 05, 2016
Location: Ogun State
Project Description; A private luxury hall needs to be doubled for an upcoming event. Owner wants his friends to as much as possible not know he has expanded the hall capacity except by size.
Duration; 2 months, mid August to mid October, 2012.
Construction and Project Management Portfolio handled by Rich Ruler Ltd.
Pros; A bungalow project, length was the same but width had to be doubled. simple you would say but not quite.
Cons; some of the finish items couldn't be sourced locally; took time and we had to find another way to make sure the hall was functional and met required criteria for the upcoming event. ofcourse you would not get some 1980 materials in 2012 but we tried matching as much as possible.
A simple expansion/movement joint was created between the old and the new building underneath then tiles laid on top.
Find below a link to some of our projects displayed here;
https://www.nairaland.com/2835349/construction-oouradio-stationago-iwoye-swimming

Thank you for viewing.

Regards,
RichYoungRuler
for Rich Ruler Ltd.

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 9:37pm On Jun 05, 2016
week 1
work begins with demolition
windows,double swing door,anti- burglar bars, granite tiles on the floor and wall marble both internal and external all had to go!!!

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 11:32pm On Jun 05, 2016
After salvaging what could be salvaged, removal of windows,doors and anti-burglar bars. i called for a bobcat to demolish and excavate since i knew time wastage was going to derep me with this client.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 11:45pm On Jun 05, 2016
Got zinc panels to hoard the existing area and also to protect the floor marble tiles. Got a JCB for clearing and excavation, then manual labor to trim. there are columns involved in the existing building, those happened to be structural because there is a roof deck but because we are having light weight roof this time the columns become non- structural and purely aesthetic cos we need them to mirror the existing onto the proposed.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by Nobody: 12:07am On Jun 06, 2016
I'm elated to seeing this equipment in use, especially the Bobcat.

It is my dream to have one in Nigeria, it's an exceptionally useful equipment that has many applications.

Pic shows yours truly in one that I rented for my backyard renovation here. I fell in love with it.

Looks like a nice project. I like the challenges that you faced and would have shown professionalism after you completed it. Time and materials matching.

2 Likes 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 11:39am On Jun 06, 2016
EgunMogaji:
I'm elated to seeing this equipment in use, especially the Bobcat.

It is my dream to have one in Nigeria, it's an exceptionally useful equipment that has many applications.

Pic shows yours truly in one that I rented for my backyard renovation here. I fell in love with it.

Looks like a nice project. I like the challenges that you faced and would have shown professionalism after you completed it. Time and materials matching.
I just like this man EgunMogaji, I hope to meet U someday. U r such a great person, U r d type that should easily say been there done that and actually mean it. A real multipurpose machine it is.
EgunMogaji,Nice photos, thanks. i like those other machines(esp the mini-cooper) too...$ talks.
*modified

2 Likes 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by yayagabriel(m): 3:49pm On Jun 06, 2016
RichYoungRuler:
After salvaging what could be salvaged, removal of windows,doors and anti-burglar bars. i called for a bobcat to demolish and excavate since i knew time wastage was going to derep me with this client.

Nice action against time.

1 Like

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by yayagabriel(m): 10:52am On Jun 07, 2016
Dats must have cost you a lot of research work and thinking, nice work richyoungruler

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 10:42am On Jun 08, 2016
Looking at the concrete boulders brought out you can tell a whole lot of money was pumped into this house and one would have been wasting one's time attempting to use manual labour.
During excavation some terrible soil was encountered along with refuse, which on enquiry i was made to understand there was a pool there before and when it was no longer needed was filled with all sorts. my decision was to excavate to firm soil and fill with some concrete hardcore then with sharp sand which is expected to penetrate the voids created by the boulders then i would fill with water to increase the sand's density so it can sink well into voids. i decided to use sharp sand as that would not create the kind of voids that laterite would create thereby causing cracks in the future and the rains are still here during construction.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 2:15pm On Jun 08, 2016
more progress photos

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 2:32pm On Jun 08, 2016
more

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 9:21pm On Jun 08, 2016
Week 2
Backfilling
Compaction
levelling
Compaction
Damp Proof Membrane Laying
Blinding

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 4:15pm On Jun 09, 2016
more progress photos...
we worked at nights at times.
1. DPM( thick nylon)
2.Blinding
3. laying of A142 wire mesh
4. Concreting: 1 no concrete mixer was used.

Regards,
RichYoungRuler
for Rich Ruler Ltd.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 4:26pm On Jun 09, 2016
During Concreting ...

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 12:36pm On Jun 11, 2016
Week 3
1. Blocksetting
2. Rebars/formwork/casting of columns
3. Formwork/Rebars and casting of lintels and overhang( lintels shoots out on either side)

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 12:40pm On Jun 11, 2016
Week 3 Cont'd
I didnt cast no roof beams again because i was using light weight aluminium trusses and also light weight aluminium roof covering but one thing i did do was to short columns(linked to lintels) where i had steel tapes like ''oja agba'' to anchor roof members down to the structure.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 1:11pm On Jun 11, 2016
week 4
1. blocksetting to lintels cont'd ad finished
2. terrace concreting
3.fabrication of aluminium roof trusses

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 11:17am On Jun 14, 2016
week 4 cont'd
Roofing Carcass
Roof Covering
Roof insulation

Thank you for viewing.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 11:22am On Jun 14, 2016
Week 4 cont'd
1.Roof Covering
2.Window aluminium sub-frames installation.
3. electrical works

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by Nobody: 1:50pm On Jun 14, 2016
I hereby certify you as a USA class builder.

I'm satisfied by what I see.

grin

2 Likes 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 7:41pm On Jun 15, 2016
EgunMogaji:
I hereby certify you as a USA class builder.

I'm satisfied by what I see.

grin
Thanks Boss Egun, na Grace o as I'm just a regular builder.

1. Aluminium fascia
2. Fixing of internal wall marbles

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by Nobody: 7:45pm On Jun 15, 2016
RichYoungRuler:

Thanks Boss Egun, na Grace o as I'm just a regular builder.

1. Aluminium fascia
2. Fixing of internal wall marbles

May I contact you for a quote for my roof.

I'm looking for a zero story perfect job. I know you can do it but not sure if you take a small job like that.

It's on my small 3,500 sq ft residence.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 7:46pm On Jun 15, 2016
Week 5
1. Internal marble laying cont'd
2. Exterior wall marble laying
3. M n E cont'd

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 7:49pm On Jun 15, 2016
progress photos...

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 7:56pm On Jun 15, 2016
EgunMogaji:


May I contact you for a quote for my roof.

I'm looking for a zero story perfect job. I know you can do it but not sure if you take a small job like that.

It's on my small 3,500 sq ft residence.
Thought u've roofed the garage already and on the main building now?
No job is too small or too big Boss. PM or straight on your thread?

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by Nobody: 8:07pm On Jun 15, 2016
RichYoungRuler:

Thought u've roofed the garage already and on the main building now?
No job is too small or too big Boss. PM or straight on your thread?

I'll pm you. This is for the main house, the piece de resistance grin has to be crowned perfectly.

2 Likes 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 12:09pm On Jun 20, 2016
More progress Photos
i learnt something new whilst on this project. Plastering and tiling was done almost concurrently as opposed to the more common method of plastering and rubbing so as to allow the surface to be a bit rough for adhesion of cement and tiles over it. The plastering was done and some metal fasteners were fixed( because of the weight of marble) and then the marble were adhered to the surface after the addition of cement paste as usual.

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 4:17pm On Jun 22, 2016
Progress made;
Installation Of Windows
Fixing of marbles cont'd;

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 8:31pm On Jun 23, 2016
Progress Photos and report;
scenario...the initial building has a roof deck before the aluminium roof which houses birds, reduced the sound effects of rainfall and also acts as thermal insulator. Now, we cannot have another slab for time constraints and we ended up using vitapur insulation which was going to do exactly what we needed, thermal insulation and helps with sound as well because of the sprayed foam.
Electrical works continued,tiling of internal columns started.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 5:57pm On Jun 24, 2016
progress photos
let's see the joint on this side of the building
tiling of column sides cont'd
terrace tiling
electricals cont'd
EgunMogaji,thank you for the mention.

1 Like 1 Share

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 5:41pm On Jul 06, 2016
Finishing Stages
Bulk heads used to mirror the deep and large sized beams supporting the slab on the existing build.
At this point it was clear the floor marbles were not going to arrive the country before the intended use of the hall. A mentor,Mr.Bisi decided it was best to screed the floor with lean mix concrete that can be easily taken off when required. the plan was to screed and then have a rug laid on both areas.

Re: Built In 1980, Capacity Doubled In 2012; Private Hall Extension by RichYoungRuler(m): 5:45pm On Jul 06, 2016
Progress Photos Cont'd...
Suspended Ceiling Installation and floor screeding

1 Like 1 Share

(1) (2) (Reply)

Newly Made Set Of Chairs @ Ikorodu Lagos / Springwood estate with a lagoon view close to New Airport Ibeju Lekki / Autogate- The Stress Free Way To Open And Close Gates

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 37
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.