Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,156,397 members, 7,830,026 topics. Date: Thursday, 16 May 2024 at 03:12 PM

FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway (22154 Views)

2019: Ekere Faces Disqualification …accused Of N40bn Fraud By funmi Akinbolu / Ugwuanyi Tasks Contractors On Speedy Completion Of Projects / See Thickness Of The 8 Lane Road Expansion Going On In Owerri (pictures) (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Islie: 7:16pm On Mar 04, 2018
Posted By: Shola O’Neil, and Olawale Sanusi,



The Federal Government has directed the contractor handling the construction and rehabilitation works on the N40billion Port Harcourt – Aba highway project to fast track and ensure quick completion of the project.

The multibillion naira Federal project is being handled by China Civil Engineering and Construction Company (CCECC), which has assured that January 2020 delivery date is feasible.

The project supervisor, Mr. Idongesit Ebotakpan, during an inspection of the project site in Port Harcourt at the weekend, revealed that the Federal Government gave the marching order and directed that the job should be top quality.

He explained that the project, which is expected to have a 50-year lifespan would meet the best standard, stressing, “nobody is joking with the quality of job on the road.”
He revealed that the Minister of Works, Mr Babatunde Fashola, while awarding the contract, was specific that the quality of job done on the road must be world standard.

“This is a dual carriage road, the distance is from Eleme Juction to Aba that is the exact length of the project. The first contract was about N34 billion, but there were some important issues arising along the way like the issue of not taking care of road drainage after construction, so that called for a re-design of the project and the current design which is expected to consume N40 billion will take care of those setbacks.

“We have changed the whole design of the road and the present design has four lanes on both side (taking it) to eight lanes on completion, that is where we are now.

“So rehabilitation work will be from Imo bridge down to Aba, what we are doing here will also be replicated at Aba axis with four lanes making it eight lanes at the end”
The Aba/ PortHarcourt road is a very strategic road to the nation’s economy as it links Aba and other industrial heartland of the East with Port Harcourt, the nations oil hub.

The road has been in a very dilapidated state for a long time thus crippling business activities, while creating opportunities for kidnappers and bandits who take advantage of the bad state to attack traders and other road users.

Also speaking, the Project Director, Mr. Charles Okonma, lauded President Muhammad Buhari for approving the project which according to him, would alleviate the sufferings of the masses and add positive value to the economy.

His words: “One of the main policies of president Buhari administration is the economic recovery and growth plan ( ERGP), and one of the plans on that policy platform is massive infrastructural development, of which this project is one of them. You know when you improve in infrastructure you are growing the economy and when you grow the economy you take people out of poverty.”

“Works have started fully, the initial project design problems has been overcome, we will ensure that the project is completed at the stipulated time, the contractors doesn’t have any payment problems and additional funds will be made available as the project goes on’’.

The CCECC Project contractor, George Gao assured Nigerians that the project would be delivered at the agreed time of January 2020, acknowledging that the job has been properly funded by the government .

He said “We are not lacking anything in terms of funds, and from now on work has started fully. We have 41 kilometers from Aba road, Eleme junction to Imo river bridge.

“The entire length of the road we are working on is 41 kilometers. We have two registered engineer and we have 15 technicians like mechanics, carpenters, surveyors and others. The duration of this project is 30 months and we will stick to that’’.

The spokesman for Oyigbo Community, Mr. Alex Ibe, thanked the Federal Government for the project, stating that it would ensure free movement and ease traffic congestion in the ever busy expressway.

The Chairman of Nigerian Society of Engineers (NSE), Dr. Howells Hart described the project as a wonderful initiative and urge the government to do more.


http://thenationonlineng.net/fg-orders-speedy-completion-n40bn-8-lane-ph-aba-highway/

4 Likes 1 Share

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by kabrud: 7:28pm On Mar 04, 2018
Go and get your PVCs, we don't need roads in Aba, all we need is Jonathan, we must vote out the dullard.

48 Likes 5 Shares

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Nobody: 8:13pm On Mar 04, 2018
kabrud:
Go and get your PVCs, we don't need roads in Aba, all we need is Jonathan, we must vote out the dullard.
Sharap!!!

U can vote out d dullard but u need d road.

83 Likes 1 Share

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Nobody: 8:15pm On Mar 04, 2018
kabrud:
Go and get your PVCs, we don't need roads in Aba, all we need is Jonathan, we must vote out the dullard.
Sarcasm noted

44 Likes 2 Shares

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by kabrud: 8:16pm On Mar 04, 2018
life2017:

Sarcasm noted
Your head dey there.

20 Likes 1 Share

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by princepeter566: 8:54pm On Mar 04, 2018
someone should please help me tell that dullard at aso rock that he's exiting that seat come 2019 by fire by force

21 Likes

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Omeokachie: 8:58pm On Mar 04, 2018
Does FG "orders" still work?

Buhari "ordered" IGP to relocate to Benue but the man simply ignored the president and nothing happened.

He "ordered" service chiefs to move the north-east, but those guys have stayed put in Abuja.

Ordering contractors you are probably owing is just a complete waste of time, and nothing but playing to the gallery.

86 Likes 8 Shares

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Nightwolf1: 9:05pm On Mar 04, 2018
Where do they want to construct four lanes each? Is it the same ph-aba I travel along ones a week?

The level of lies oozing out from criminals in this govt is beyond redemption.

As matter of fact, let them fix the dual lane first before talking about 4 lanes on both side. Thieves.

73 Likes 7 Shares

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by eleojo23: 9:26pm On Mar 04, 2018
Yes o.
The have to complete it before the date or at least 80% complete so that it can enter the list of Buhari's achievements before the election.

Bubu needs to score late points now.
Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by EponOjuku: 9:27pm On Mar 04, 2018
Nightwolf1:
Where do they want to construct four lanes each? Is it the same ph-aba I travel along ones a week?

The level of lies oozing out from criminals in this govt is beyond redemption.

As matter of fact, let them fix the dual lane first before talking about 4 lanes on both side. Thieves.

Fix which dual lane?

Didn't Igbos tell us that GEJ fixed that particular road when you were campaigning for GEJ in 2015?

Liars ought to have good memories.

17 Likes 1 Share

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by IgboticGirl(f): 9:27pm On Mar 04, 2018
grin grin grin

Dis government and their propaganda self


Let me keep quite before this children from hate filled skull miners will come for me

8 Likes 3 Shares

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by lonelydora: 9:28pm On Mar 04, 2018
Speedy you say? When we haven't seen any bulldozer anywhere along that road

14 Likes 2 Shares

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by greggng: 9:29pm On Mar 04, 2018
princepeter566:
someone should please help me tell that dullard at aso rock that he's exiting that seat come 2019 by fire by force


You talk as if your vote counts

1 Like 1 Share

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by yemi15(m): 9:30pm On Mar 04, 2018

7 Likes

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by bluelaptop: 9:30pm On Mar 04, 2018
Sharp, no time
Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by wasyouy: 9:31pm On Mar 04, 2018
grin angry

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by exlinklodge: 9:31pm On Mar 04, 2018
about time
Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Flexy2vybes(m): 9:31pm On Mar 04, 2018
Him 4 evn award d contract frm aso rock 2 daura cuz trust CCECC dm fit finish d road by dz tym 2o19.

2 Likes

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by CoolFreeday(m): 9:32pm On Mar 04, 2018
God bless my President

3 Likes

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by DWJOBScom(m): 9:32pm On Mar 04, 2018
Still doesn't stop us from voting him out as this is a bribe and today is sunday abeg

i wonder what happens after 2019 should he lose as the road will be neglected

7 Likes

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by westergreen: 9:34pm On Mar 04, 2018
please get your pvc and together we can vote out the senile, dotard, dullard of Daura.

4 Likes 1 Share

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by dingbang(m): 9:34pm On Mar 04, 2018
So he thinks he can bribe the Igbos with this grand lie...



We like the road like that.. He should get out from that seat

6 Likes 3 Shares

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by HeroicMeastro: 9:34pm On Mar 04, 2018
kabrud:
Go and get your PVCs, we don't need roads in Aba, all we need is Jonathan, we must vote out the dullard.
Who is this asshole?

3 Likes 1 Share

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Yankee101: 9:35pm On Mar 04, 2018
SS/SE votes loading. But e no go ever load finish for Buhari

1 Like

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Nobody: 9:35pm On Mar 04, 2018
Islie:







http://thenationonlineng.net/fg-orders-speedy-completion-n40bn-8-lane-ph-aba-highway/





They want to complete what they have not even started.

O dikwa egwu

11 Likes 1 Share

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by ZombieBuster: 9:35pm On Mar 04, 2018
kabrud:
Go and get your PVCs, we don't need roads in Aba, all we need is Jonathan, we must vote out the dullard.


Buhari is a terrorist
Buhari is an illiterate
Buhari is corrupt... Ask transparency international
I said Buhari is corrupt... Ask maina
Buhari is a nepotic dullard
Buhari is a harbinger of hardship and bad governance


Buhari is badluck and badnews

9 Likes 2 Shares

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by RexTramadol1: 9:35pm On Mar 04, 2018
Igbayi laaro!





Buhari pls face front.

1 Like

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by ZombieBuster: 9:36pm On Mar 04, 2018
jusRadical:




They want to complete what they have not even started.

O dikwa egwu

A government based on propaganda and lies
What do you expect from Apc

13 Likes

Re: FG Orders Speedy Completion Of N40bn, 8-lane Ph-aba Highway by Nobody: 9:37pm On Mar 04, 2018
EponOjuku:


Fix which dual lane?

Didn't Igbos tell us that GEJ fixed that particular road when you were campaigning for GEJ in 2015?

Liars ought to have good memories.


Arab contractors are working from Umuahia towards Aba. It was awarded by gej.

9 Likes 1 Share

(1) (2) (3) (Reply)

Sowore Won’t Be Released Until Due Process Is Followed – DSS / APC Crisis: How Lack Of Consensus Stalled Oshiomhole’s Removal / CJN Unhappy Over Conflicting Decisions By Appeal Court Divisions

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 45
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.