Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,156,248 members, 7,829,456 topics. Date: Thursday, 16 May 2024 at 07:19 AM

Construction Process Of High Rise Residential Apartment In Lagos - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Process Of High Rise Residential Apartment In Lagos (374 Views)

Some Of The Worst Sky Scrapper, High-Rise Building Collapses In History(Photos) / The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process / Bella Disu Completes Luxurious High Rise Complex (Pictures) (2) (3) (4)

(1) (Reply) (Go Down)

Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 8:17am On Jun 03, 2023
Dear Nairalanders,

This is my first time here in nairaland, I was training by construction genius (Aventures's) popularly knows in the this platform


I'm here to take us through the process of high rise residential apartment owned by popularly know developer in Lagos state God made home(GHM) we have 3 blocks which are A,B,and C.

This project contain 10 floors, Ground with mezzanine floor are car park, the remaining floor contain 3 bedroom with BQ and 2 bedroom with BQ, suspended swimming pool,gym house,launch, facility management.

This project is sitting on the solid pile foundation of 600 diameter well design and approved by government

I'm confidently handle this project from the beginning and to the finishing stage duration of 24 months

To make enquiry about getting the price and you want to invest for your future please call me or send E-mail I will respond immediately.

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 9:35am On Jun 03, 2023
The best way to solidify your building is to get your foundation right by go through the virtue process

Check the strength of the pile with wave method the 2 weakest would be used for loading test to minimize the risk for worse case scenario

Using 6" block as formwork is economical and safe from deformation

Re: Construction Process Of High Rise Residential Apartment In Lagos by Aventures(m): 2:57pm On Jun 03, 2023
Great Job, wishing you the best.

1 Like

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 3:12pm On Jun 03, 2023
Thanks boss
Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 7:43pm On Jun 12, 2023
It's been some weeks working hard in site to bring out a solid and efficient foundation to resist the load of super-structure

After setting blocks on the pile cap we brake the piles to the required level

Then we backfill remaining space by the side of the block wall to avoid deformation during the casting of pile cap

After the backfilling rebars to pile cap, fixing the reinforcement to the pile cap

And locating the column point and fixed the column starter before the casting of the pile cap

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 7:45pm On Jun 12, 2023
Casting of the pile caps

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 7:49pm On Jun 12, 2023
The whole pile cap has been cast with good vibrator

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 3:40pm On Jun 14, 2023
surveyor has an important role to play on site such as setting out the building point,pile carp point, columns location, setback

I have surveyor on site to get all those things done

There's some tasks need to start on before finishing of pile cap,such as blinding in some part that's ready

Blinding to receive ground beam as commence in some area of block A,and

Shuttering to ground beam is also in place

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 8:49am On Jul 11, 2023
We are been working very hard to get the foundation right for the past month and thank we are moving closer to the positive results just exactly as we planned it to be

Casting of the ground beam is done successfully with grade 30kn/m³ according to the structural engineer description

After this stage we are moving to back filling in the foundation to make up level .


There's is a room for questions and business contact me on 08033925673,08087141253, and email royalconstructionengineering1@gmail.com

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 2:54pm On Jul 11, 2023
Removing of the ground beam formwork taking place ahead of back filling of the foundation

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 9:28am On Jul 12, 2023
Backfilling to foundation is done completely it's amazing that I couldn't buy a single trip of filling sand

The entire foundation was fill up with excavated materials acquired from the pile cap

And it's well compacted

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 10:31pm On Jul 18, 2023
It's as been 4 days ago we done with compaction of the foundation filling


Laying of damp prove membrane (DPM) as done perfect with Blinding to receive reinforcement

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 8:19am On Jul 19, 2023
Rebars to ground floor is in progress

Re: Construction Process Of High Rise Residential Apartment In Lagos by Royalconstruct(m): 6:32pm On Jul 25, 2023
Casting of the ground floor is in progress

(1) (Reply)

My Landlady Says She Will Pump Water Once Every 5days Due To Increase In Tariff. / Relocation Sales / Bulk Land For Sale In Lekki With Good Title

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 45
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.