Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,161,424 members, 7,846,771 topics. Date: Friday, 31 May 2024 at 11:17 PM

Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG (564 Views)

Gov Soludo Commences The Construction Of A Superhighway Linking Imo And Anambra / Nasarawa Government House Without Electricity For 24 Years - FG / We Spent N2.75tn On Power, Roads In Two Years – FG (2) (3) (4)

(1) (Go Down)

Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by FreeStuffsNG: 10:47pm On Sep 23, 2023
Lagos Greenfield superhighway will be completed in 4 years — FG

The Federal Government on Saturday assured that the proposed 470-kilometre Abuja-Lagos Greenfield superhighway will be completed in four years and last for 100 years.


They also ensured that the four-and-a-half-hour travel time for vehicles covering the route at a speed of 100 kilometres per hour was achievable.

He stated that the road would be constructed by a private-sector consortium at no cost to the government.

Additionally, he mentioned that President Bola Ahmed Tinubu had approved expediting the project, with the contractor set to be on-site within three months.

According to Umahi, the consortium, Advance Engineering Company (AEC) Network Limited, will operate the facility for a yet-to-be-determined period on a Build, Operate, and Transfer (BOT) deal.

The superhighway would have toll points to enable investors to recoup their investment.

“When I first introduced this to the public, many doubting Thomases were saying, ‘it is impossible.

The Lagos-Abuja trip that takes 14 hours cannot be done in four and a half hours.’ This is the renewed hope of Mr. President,” the minister said.

“The president has approved fast-tracking this project. The superhighway will have two lanes, with each lane being a two-car carriageway with a width of 14 metres.

“The only carriageway equivalent to this is the Third Mainland Bridge, where each carriageway is 14 metres wide. It will be constructed with a 275-millimeter-thick concrete layer.

“The projected lifespan of this project is 100 years. It will be completed within four years, and this is achievable. Several bridges will be built, and tolling points will be established.

“We are not investing any money, but we will assist them in every possible way,” he added.

Umahi further explained that the superhighway, made entirely of concrete, would pass through eight states in the south-west and north-central before reaching Abuja.

The states include Kogi, Ekiti, Oyo, FCT, Lagos, Ogun, Niger, and Kwara.


The minister commended the private consortium behind the deal, expressing satisfaction with their concept and preparations.


“So, the next step is to present the business proposal so we can negotiate the project’s cost. Then they will engage with the Ministry of Finance to negotiate their funding.

“The advantage of building this road with concrete is that we can predict the cost. For asphalt, the cost varies each month.

“Concrete roads are more durable and cost-effective than asphalt. I have directed all ongoing projects that haven’t progressed beyond 80 per cent to shift to concrete,” he said.

Umahi emphasised the project’s seriousness, noting that the contract agreement would be rigorous. If the consortium backs out unreasonably, it may be liable to pay a fine of $10 million.

The chairman of the consortium, Kenny Martins, described the project as “the first of its kind in Africa,” highlighting that it would be ICT-compliant with a fibre optic connection, solar-powered street lights, and security points throughout the road.

Martins explained that in Lagos, the route would start from the proposed 4th Mainland Bridge in Epe and extend to Abuja.

Upon completion, travel time would be reduced to just four and a half hours from Lagos to Abuja.

https://tribuneonlineng.com/lagos-greenfield-superhighway-will-be-completed-in-4-years-fg/
Mynd44 nlfpmod

6 Likes

Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by FreeStuffsNG: 10:47pm On Sep 23, 2023
This is a great development. It will equally open up the 8 states and Abuja to more developments.

5 Likes

Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by TemplarLandry: 10:50pm On Sep 23, 2023
cool
Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by PrinceOfLagos: 10:50pm On Sep 23, 2023
Very good

Let's hope those Touts that extorts motorist's in Lagos won't constitute nuisance on the highway if finally completed

1 Like

Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by epondudu: 11:03pm On Sep 23, 2023
Dem don start OOO, time to milk the meadow 😂
Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by Alchemy528: 11:42pm On Sep 23, 2023
Investing in modern transportation infrastructure like the Greenfield Superhighway is vital for economic growth and urban development."
Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by BitterTruth01: 12:21am On Sep 24, 2023
Why does the title say Lagos Highway when it’s actually an interstate highway that crosses 8 states ?
Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by blacksam01: 12:27am On Sep 24, 2023
we dont need this at this time...we need railways to network the country...we are tired of road construction since 1999

1 Like 1 Share

Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by limeta(f): 1:39am On Sep 24, 2023
100 miles an hour super high way
To last 100 years ok what ever reading the comments above it seems the people believe it .
Kingdom of pot holes .

1 Like

Re: Lagos Greenfield Superhighway Will Be Completed In 4 Years — FG by Mynd44: 8:09am On Sep 24, 2023

(1)

As An Igbo Soldier How Do Feel When Going To Burn And Kill In Igboland / How Tinubu Betrayed Kalu After Senate Presidency Offer - Tinubu's Supporter / Can one get Manufacturers Of Stuff Like PCB And Say Rechargeable Lamps In Aba

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.